Field Guide › Cheat Sheets › Facility Audit Checklist
Facility Audit Checklist
Monthly walkthrough checklist covering chemical storage, equipment, labeling, training records, and waste handling — the ten things inspectors look for first.
Portrait · 2 pages · 8.5 × 11 in · Last reviewed: June 2026
Facility Audit Checklist (PDF)Portrait · 2 pages · 8.5 × 11 in
Download PDF
How to use this checklist
How to mark:
P Pass — meets requirement, evidence on file.
G Gap — does not meet; record in findings section.
N/A Not applicable — explain in notes column.
Walk-through audit for chemical-handling facilities. Mark each item PASS, GAP, or N/A. Photograph any GAP and log it in the Findings & Follow-Up section below.
Checklist sections
1. Chemical Storage
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| Acids and caustics stored in separate, ventilated cabinets. |
|
|
|
OSHA 1910.106; HMIS |
|
| Oxidizers (bleach, peroxides) stored apart from organics and reducers. |
|
|
|
OSHA 1910.104; NFPA 430 |
|
| Flammables (>5 gal) in approved flammable cabinet, grounded. |
|
|
|
OSHA 1910.106(d)(3) |
|
| Container lids closed and labeled; no decanted product in mystery jugs. |
|
|
|
OSHA 1910.1200(f) |
|
| Aisles around storage 36″ minimum; emergency egress clear. |
|
|
|
OSHA 1910.37(a)(3) |
|
| Temperature within product label range (typ. 40–100°F for cleaners). |
|
|
|
Manufacturer TDS |
|
| Secondary containment present for >55-gal containers. |
|
|
|
EPA 40 CFR 264.175 |
|
| Storage area inspected monthly; log signed and dated. |
|
|
|
Site SOP |
|
2. Labels & Container Identification
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| Manufacturer labels intact on every primary container. |
|
|
|
OSHA 1910.1200(f)(1) |
|
| Secondary containers (spray bottles, buckets) labeled with product name + hazards. |
|
|
|
OSHA 1910.1200(f)(6) |
|
| GHS pictograms visible and current — no whited-out symbols. |
|
|
|
HCS 2024 update |
|
| Bilingual labels where workforce primary language is not English. |
|
|
|
OSHA Letter 4/2017 |
|
| Dilution date noted on secondary containers of dilutables that degrade. |
|
|
|
Site SOP |
|
| Containers transferred between shifts re-labeled by receiving shift. |
|
|
|
OSHA 1910.1200(f)(6) |
|
3. Safety Data Sheets (SDS)
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| SDS available within 5 minutes for every chemical on site. |
|
|
|
OSHA 1910.1200(g)(8) |
|
| Binder location posted at all chemical storage areas (or digital QR posted). |
|
|
|
Site SOP |
|
| Digital access works offline OR on emergency-available device. |
|
|
|
OSHA 1910.1200(g)(8) |
|
| Section 8 reviewed at product introduction and at each label revision. |
|
|
|
OSHA 1910.1200(g)(5) |
|
| Discontinued products removed from active binder; archive kept 30 years. |
|
|
|
OSHA 1910.1020(d)(1) |
|
| HCS 2024 transition: substance SDSs updated by Jan 19, 2026; mixtures by Jul 19, 2027. |
|
|
|
29 CFR 1910.1200 (2024) |
|
4. Dispensing & Dilution
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| Dispenser tip/orifice matches the labeled output ratio (no field-swapped tips). |
|
|
|
Manufacturer spec |
|
| Dilution verified quarterly with test strip, conductivity meter, or titration. |
|
|
|
ASTM D5095 |
|
| Quat sanitizers verified at 200 ppm minimum at point of use. |
|
|
|
21 CFR 178.1010 |
|
| Bleach disinfectant verified per label contact time AND ppm requirement. |
|
|
|
EPA registration |
|
| Back-siphon prevention (air gap or vacuum breaker) on dispenser water inlet. |
|
|
|
Local plumbing code; ASSE 1055 |
|
| Manual dilution: pump or measured cup, not eyeballed from the jug. |
|
|
|
Site SOP |
|
5. PPE Program
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| Hazard assessment on file for each task using chemicals. |
|
|
|
OSHA 1910.132(d) |
|
| Glove material matched to chemistry per manufacturer permeation data. |
|
|
|
ANSI/ISEA 105 |
|
| Splash goggles available where SDS Section 8 specifies them. |
|
|
|
ANSI Z87.1 |
|
| Respirator fit-test on file for any cartridge-mask user; renewed annually. |
|
|
|
29 CFR 1910.134(f) |
|
| Medical evaluation completed before respirator issuance. |
|
|
|
29 CFR 1910.134(e) |
|
| Eyewash within 10-second travel time from chemical handling areas. |
|
|
|
ANSI Z358.1-2014 |
|
| PPE supply replenished — sufficient stock for one full shift’s loss. |
|
|
|
Site SOP |
|
6. Training Records
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| Hazard Communication training documented for every worker who handles chemicals. |
|
|
|
OSHA 1910.1200(h) |
|
| Training repeated at new product introduction and at job/task change. |
|
|
|
OSHA 1910.1200(h)(1) |
|
| Records retained 3 years; signed by trainee. |
|
|
|
29 CFR 1904.33 |
|
| Lockout/tagout training current for autoscrubber and powered equipment users. |
|
|
|
OSHA 1910.147(c)(7) |
|
| Bloodborne pathogens training for restroom and healthcare staff (annual). |
|
|
|
29 CFR 1910.1030(g)(2) |
|
| Confined-space entry training for any pit, sump, or tank cleaning. |
|
|
|
29 CFR 1910.146(g) |
|
7. Signage & Wayfinding
| Checkpoint |
P |
G |
N/A |
Reference |
Notes |
| Eyewash station signed; visible from any approach. |
|
|
|
ANSI Z358.1-2014 §5.4.4 |
|
| Wet-floor signs available at every closet entrance; staff trained to deploy. |
|
|
|
OSHA 1910.22(a)(2) |
|
| Chemical storage area marked with NFPA 704 placard (or HMIS). |
|
|
|
NFPA 704; OSHA 1910.1200 |
|
| Emergency exit routes posted and unobstructed. |
|
|
|
OSHA 1910.37 |
|
| First-aid kit location signed; contents current and inventoried quarterly. |
|
|
|
29 CFR 1910.151(b) |
|
| Spill kit location signed at every chemical storage area. |
|
|
|
Site SOP |
|
Findings & Follow-Up
| # |
Section / Item |
Gap description |
Action owner |
Due date |
| 1 |
|
|
|
|
| 2 |
|
|
|
|
| 3 |
|
|
|
|
| 4 |
|
|
|
|
| 5 |
|
|
|
|
| 6 |
|
|
|
|
| 7 |
|
|
|
|
| 8 |
|
|
|
|
| 9 |
|
|
|
|
| 10 |
|
|
|
|
| 11 |
|
|
|
|
| 12 |
|
|
|
|
Audit cadence
Monthly — Sections 1, 2, 7 (storage, labels, signage). Walking inspection by site lead.
Quarterly — Full checklist (all 7 sections). EHS or designated auditor.
After incident or product change — Targeted re-audit of the affected section within 5 business days.
Annually — Full checklist plus regulatory update review (CFR changes, state VOC rule updates, ANSI Z358.1 cycle).
Related articles
Facility Audit Checklist (PDF)Print at 100% scale. Laminate for wet or chemical-storage areas.
Download PDF